Chloe G. Shepherd March 14, 2018 Corrective Action, Remediation, Risk Assessment, Fate & Transport Modeling Remediation & Risk Assessment Chloe G. Shepherd March 14, 2018 Corrective Action, Remediation, Risk Assessment, Fate & Transport Modeling Sandy Lake, PACorrective actions were initiated following the discovery of unleaded gasoline and diesel fuel contamination...
Chloe G. Shepherd March 13, 2018 Remediation Vacuum-Enhanced Groundwater Pump & Treat System Chloe G. Shepherd March 13, 2018 Remediation Youngstown, OhioDesign, Construction, & Installation of an 8-Well Vacuum-Enhanced Groundwater Pump & Treat System. We designed...
Chloe G. Shepherd March 7, 2018 Corrective Action, Remediation Excavation, Chemical Injection & Institutional Controls Chloe G. Shepherd March 7, 2018 Corrective Action, Remediation New Kensington, PACorrective actions were initiated following the discovery of unleaded gasoline contamination during an underground...
Chloe G. Shepherd March 7, 2018 Corrective Action, Remediation Remediation & Non-Use Aquifer Designation Chloe G. Shepherd March 7, 2018 Corrective Action, Remediation Pittsburgh, PACorrective actions were initiated following the discovery of “obvious, extensive contamination” during a UST closure...
Chloe G. Shepherd March 7, 2018 Remediation, Risk Assessment Excavation/Chemical Application & Risk Assessment Chloe G. Shepherd March 7, 2018 Remediation, Risk Assessment Wesleyville, PACorrective actions were initiated following the discovery of “obviously” contaminated soil and groundwater...
Chloe G. Shepherd March 7, 2018 Remediation, Phase 1 ESA / Phase 2 ESA Subsurface Investigations & Remediation at 3 Dry Cleaner Sites Chloe G. Shepherd March 7, 2018 Remediation, Phase 1 ESA / Phase 2 ESA Northeast OhioFlynn conducted subsurface investigations at three dry cleaner sites for the seller of the businesses...
Chloe G. Shepherd March 7, 2018 Remediation Vapor Mitigation Chloe G. Shepherd March 7, 2018 Remediation Columbus, OhioA release of diesel fuel occurred from UST product line piping supplying a backup power generator....
Chloe G. Shepherd March 7, 2018 Remediation Remediation System Chloe G. Shepherd March 7, 2018 Remediation Pepper Pike, OhioFlynn Environmental designed, constructed, and installed a dual phase groundwater extraction (DPE) system tailored...